Nua Healthcare Cork.

Modern 3000 SQFT Extension .

Construction process

A 3000 SQFT Extension using the MFC light gauge steel construction process using Magnesium Oxide coated  board.per ones.

Build time

The building was airtight in 8 days.

BER Rating

U – values the house achieved the BER rating oF A2 on completion

Windows

Triple glazed Aluclad window and doors throughout. ( Completely air tight )

Heating

Underfloor heating throughout the house using an air to water heat pump system. ( Very low energy bills ).